Cost analysis: stormwater harvesting with a water credit
Example Problem 4: pump station, force main and pond, with the resale credit.
Help: Cost Analysis (help page 350) · Download the .bmpt · Link to Solution in BMPFast Version 2
1The problem
The BMPFast sample project Example Problem 4: the stormwater harvesting system (pond, intermittent pump station, force main), mowing four times a year, 6,000 kWh a year of pumping, and a credit for the water sold (Stormwater Resale). Discount rate 3.3 %, 30 years, inflation 2.5 %.
| Input | Value | Source |
|---|---|---|
| Project (General Site Information) | ||
| Meteorological zone | Florida Zone 5 | Zone map (help page 815) |
| Mean annual rainfall | 61 in | Mean annual rainfall map (help page 815) |
| Performance standard (analysis type) | Net Improvement | BMPFast sample project |
| Cost analysis | ||
| Discount rate | 3.3 % | Cost analysis parameters |
| Duration | 30 years | Cost analysis parameters |
| BMP inflation rate | 2.5 % | Cost analysis parameters |
Find: the present worth, the annual cost and the cost per pound of TN and TP removed.
2Steps in BMPFast
Press 6. Cost Analysis. The hub lists every catchment’s BMP; set the discount rate and duration in A.

The Cost Analysis hub (6. Cost Analysis). Double-click the Stormwater Harvesting row. In B enter the components (construction low and high, life, O&M %), in C the routine costs, in D the energy; press Calculate.

Cost analysis of one BMP: A parameters and B components. Collapse B and open C: the routine maintenance costs, here with the Stormwater Resale credit where there is one (a negative cost). Open E for the summary: present worth, annual cost and cost per pound (the results below).

The same window with C open: the routine maintenance costs. Back on the hub, Unit Cost Summary Report shows the costs of every BMP. Press Save Project to keep your copy; compare it with the .bmpt under Files.

The Unit Cost Summary Report.
3Results
| Result (low – high) | Value |
|---|---|
| Construction | $175,000 – $265,000 |
| Present value of replacements | $34,240 – $51,360 |
| Present value of O&M | $99,420 – $143,632 |
| Present worth | $308,660 – $459,992 |
| Annualized cost | $16,364 – $24,388 |
| Cost per lb TN removed | $318.39 – $474.50 |
| Cost per lb TP removed | $2,300.52 – $3,428.44 |
| TN / TP removed | 32.31 / 4.47 lb/yr |
The component cost report
Open this report on its own page.
Unit Cost Summary Report
4Check
| Present worth | = construction + PV of replacements + PV of O&M |
| = 175,000 + 34,240 + 99,420 | |
| = $308,660 (low; program $308,660). |
Annualized cost.
| CRF (capital recovery factor) | = i(1+i)N / ((1+i)N − 1) |
| = 0.05302 (i = 3.3 %, N = 30 years). |
| Annualized cost | = present worth × CRF |
| = 308,660 × 0.05302 | |
| = $16,364 a year (program $16,364). |
| Cost per pound | = present worth / (pounds removed a year × years) |
| = 308,660 / (32.31 lb/yr × 30) | |
| = $318.39 per lb TN (program $318.39) (Cost Analysis Methodology). |
5Files
- cost-pond-harvesting.bmpt: the project, saved by BMPFast. Save it (your browser puts it in Downloads). In BMPFast press Open Project, then Open Project again in the Open BMPFast Project dialog (below its Recent Projects list), and choose the file.
- Component cost report (as BMPFast shows it)
- Unit Cost Summary Report (as BMPFast shows it)
- Summary Report (as BMPFast shows it)
- BMP report (worksheet) (as BMPFast shows it)