Routing: two subdivisions joining at a wet pond

Two catchments with retention join a third with a wet pond; All sites non-exempted.

1The problem

Two subdivisions (8 and 6 ac), each with a small retention basin, drain to a 4-acre town center whose wet pond treats everything before the outlet.

InputValueSource
Project (General Site Information)
Meteorological zoneFlorida Zone 2Zone map (help page 815)
Mean annual rainfall50 inMean annual rainfall map (help page 815)
Performance standard (analysis type)All sites non-exemptedSite (illustrative)
Catchment 1: North subdivision (Watershed Characteristics)
Land use, pre / postAgricultural - Pasture / Single-FamilySite (illustrative)
Area, pre / post8 / 8 acSite (illustrative)
Non-DCIA curve number, pre / post61 / 75Site (illustrative)
DCIA, pre / post0 / 25 %Site (illustrative)
EMC TN, pre / post3.030 / 1.770 mg/LBMPFast land use table (AH Vol I Table 9.2)
EMC TP, pre / post0.593 / 0.327 mg/LBMPFast land use table (AH Vol I Table 9.2)
BMP used in routingRetention: Provided Retention Volume 0.5 ac-ft; Time to recover design volume 72 hrDesign (illustrative)
Routes toCatchment 3Site (illustrative)
Catchment 2: South subdivision (Watershed Characteristics)
Land use, pre / postAgricultural - Pasture / Single-FamilySite (illustrative)
Area, pre / post6 / 6 acSite (illustrative)
Non-DCIA curve number, pre / post61 / 75Site (illustrative)
DCIA, pre / post0 / 25 %Site (illustrative)
EMC TN, pre / post3.030 / 1.770 mg/LBMPFast land use table (AH Vol I Table 9.2)
EMC TP, pre / post0.593 / 0.327 mg/LBMPFast land use table (AH Vol I Table 9.2)
BMP used in routingRetention: Provided Retention Volume 0.4 ac-ft; Time to recover design volume 72 hrDesign (illustrative)
Routes toCatchment 3Site (illustrative)
Catchment 3: Town center (Watershed Characteristics)
Land use, pre / postAgricultural - Pasture / High-Intensity CommercialSite (illustrative)
Area, pre / post4 / 4 acSite (illustrative)
Non-DCIA curve number, pre / post61 / 80Site (illustrative)
DCIA, pre / post0 / 70 %Site (illustrative)
EMC TN, pre / post3.030 / 2.400 mg/LBMPFast land use table (AH Vol I Table 9.2)
EMC TP, pre / post0.593 / 0.345 mg/LBMPFast land use table (AH Vol I Table 9.2)
BMP used in routingWet Detention: Permanent Pool Volume 3.0 ac-ft; tick There is a littoral zone; Floating Wetland or other MAPs Credit 0 %Design (illustrative)
Routes tothe OutletSite (illustrative)

Find: the loads leaving the site when the catchments are routed through each other, and how BMPFast treats the chain.

2Steps in BMPFast 2

  1. Start BMPFast 2 and choose File ▸ New project. The tree on the left opens on the project (General Site Information). On its Entry tab enter: Project name Routing: two catchments joining at a pond; Meteorological zone Florida Zone 2; Mean annual rainfall 50.00 in; Type of analysis All sites non-exempted. (To follow along with the finished project instead, choose File ▸ Open and open routing-junction.bmpf from Files below.)

    General Site Information: the project’s Entry tab.
    General Site Information: the project’s Entry tab.
  2. Press Add Catchment (left). Select the new catchment in the tree; on its Entry tab type the name North subdivision and enter: Land use (pre) Agricultural - Pasture; Land use (post) Single-Family; Area (pre) 8.00 ac; Area (post) 8.00 ac; Non-DCIA curve number (pre) 61.00; Non-DCIA curve number (post) 75.00; DCIA (post) 25.00 %. Leave the other boxes as they are (0 or blank). BMPFast 2 calculates as you type; scroll down to Calculated for the results after development: Annual runoff coefficient (ROC) (post) 0.262; Runoff volume (post) 8.733 ac-ft/yr; Nitrogen load (post) 19.060 kg/yr; Phosphorus load (post) 3.521 kg/yr.

    The catchment North subdivision: its Entry tab.
    The catchment North subdivision: its Entry tab.
  3. With North subdivision selected, press Add Treatment and choose Retention. On its Entry tab type the Treatment name Retention (BMPFast 2 starts it as “Retention 1”) and enter: Provided retention volume 0.500 ac-ft; Time to recover the design volume 72.00 hr. The results are calculated as you type: Treatment depth 0.750 in; Nitrogen removal provided 80.20 %; Phosphorus removal provided 80.20 %.

    The treatment Retention: its Entry tab.
    The treatment Retention: its Entry tab.
  4. Open the treatment’s Report tab: its inputs and removal in this catchment, as a report to print or save.

    The treatment Retention: its Report tab.
    The treatment Retention: its Report tab.
  5. Press Add Catchment (left). Select the new catchment in the tree; on its Entry tab type the name South subdivision and enter: Land use (pre) Agricultural - Pasture; Land use (post) Single-Family; Area (pre) 6.00 ac; Area (post) 6.00 ac; Non-DCIA curve number (pre) 61.00; Non-DCIA curve number (post) 75.00; DCIA (post) 25.00 %. Leave the other boxes as they are (0 or blank). BMPFast 2 calculates as you type; scroll down to Calculated for the results after development: Annual runoff coefficient (ROC) (post) 0.262; Runoff volume (post) 6.550 ac-ft/yr; Nitrogen load (post) 14.295 kg/yr; Phosphorus load (post) 2.641 kg/yr.

    The catchment South subdivision: its Entry tab.
    The catchment South subdivision: its Entry tab.
  6. With South subdivision selected, press Add Treatment and choose Retention. On its Entry tab type the Treatment name Retention (BMPFast 2 starts it as “Retention 1”) and enter: Provided retention volume 0.400 ac-ft; Time to recover the design volume 72.00 hr. The results are calculated as you type: Treatment depth 0.800 in; Nitrogen removal provided 81.28 %; Phosphorus removal provided 81.28 %.

    The treatment Retention: its Entry tab.
    The treatment Retention: its Entry tab.
  7. Open the treatment’s Report tab: its inputs and removal in this catchment, as a report to print or save.

    The treatment Retention: its Report tab.
    The treatment Retention: its Report tab.
  8. Press Add Catchment (left). Select the new catchment in the tree; on its Entry tab type the name Town center and enter: Land use (pre) Agricultural - Pasture; Land use (post) High-Intensity Commercial; Area (pre) 4.00 ac; Area (post) 4.00 ac; Non-DCIA curve number (pre) 61.00; Non-DCIA curve number (post) 80.00; DCIA (post) 70.00 %. Leave the other boxes as they are (0 or blank). BMPFast 2 calculates as you type; scroll down to Calculated for the results after development: Annual runoff coefficient (ROC) (post) 0.600; Runoff volume (post) 10.000 ac-ft/yr; Nitrogen load (post) 29.592 kg/yr; Phosphorus load (post) 4.254 kg/yr.

    The catchment Town center: its Entry tab.
    The catchment Town center: its Entry tab.
  9. With Town center selected, press Add Treatment and choose Wet Detention. On its Entry tab type the Treatment name Wet Detention (BMPFast 2 starts it as “Wet Detention 1”) and enter: Permanent pool volume 3.000 ac-ft; How the littoral zone counts Littoral zone credit (BMPFast 2); There is a littoral zone Yes; Littoral zone credit 10.0 %. The results are calculated as you type: Average residence time 109.50 days; Permanent pool volume for 31 days residence 0.85 ac-ft; Nitrogen removal provided 52.07 %; Phosphorus removal provided 84.75 %. These are the treatment alone, on its own catchment’s runoff; the routing calculates it again with the water that drains to it from upstream, so the routing’s numbers below differ.

    The treatment Wet Detention: its Entry tab.
    The treatment Wet Detention: its Entry tab.
  10. Open the treatment’s Report tab: its inputs and removal in this catchment, as a report to print or save.

    The treatment Wet Detention: its Report tab.
    The treatment Wet Detention: its Report tab.
  11. Press Add Routing (left). BMPFast 2 adds Routing 1 under Catchment Routings, with every catchment draining to the outlet and no treatment; a project can have several routings, compared side by side. On its Entry tab (How the routing is calculated Strand routing (v1's routing; use this for permits)) set each catchment as in this table:

    CatchmentDrains toTreatment usedRunoff from upstream catchments
    North subdivisionTown centerRetention
    South subdivisionTown centerRetention
    Town centerOutletWet DetentionTreated with this catchment's own runoff

    A catchment is treated only by the treatment its routing uses.

    The routing’s Entry tab: where each catchment drains and the treatment it uses.
    The routing’s Entry tab: where each catchment drains and the treatment it uses.
  12. Open the routing’s Report tab. Results shows the loads leaving the site, the removal provided and required, and whether the performance standard is met; the list at the top of the tab has v1’s reports for the same routing (Summary, Complete, Flow Balance, AH Vol I Sec 9 compliance). Save the project with File ▸ Save; compare it with the .bmpf under Files.

    The routing’s Report tab: Results.
    The routing’s Report tab: Results.

3Results

CatchmentRunoff (ac-ft/yr)TN load (kg/yr)TP load (kg/yr)BMP → routes to
1. North subdivision8.73319.0603.521Retention → Catchment 3
2. South subdivision6.55014.2952.641Retention → Catchment 3
3. Town center10.00029.5924.254Wet Detention → the Outlet
ResultValue
Site (all catchments, at the outlet)
TN load: catchments → outlet62.946 → 17.446 kg/yr
TP load: catchments → outlet10.416 → 0.948 kg/yr
Provided removal TN / TP72.3 % / 90.9 %
Required removal TN / TP (Maximum % Removal)85.6 % (not met) / 82.9 % (met)

Strands found by BMPFast (a strand is a run of catchments in series that BMPFast may calculate as one system):

  • Catchment 1 is its own strand (1→1 starts and ends at Catchment 1) because it feeds a junction (Catchment 3), where strands end.
  • Catchment 2 is its own strand (2→2 starts and ends at Catchment 2) because it feeds a junction (Catchment 3), where strands end.
  • Catchment 3 is its own strand (3→3 starts and ends at Catchment 3) because it has more than one input (Catchments 1, 2), so BMPFast routes node by node at this junction: it adds what each input passes on to its own load and treats the total.

The Full Routing Diagram report

Open this report on its own page.

The Summary Report

Open this report on its own page.

BMPFast 2 and BMPFast (v1)

ResultBMPFast 2BMPFast (v1), its page
Nitrogen leaving the site17.446 kg/yr21.050 kg/yrdiffers
Phosphorus leaving the site0.948 kg/yr1.492 kg/yrdiffers
Site removal, nitrogen72.284 %66.558 %differs
Site removal, phosphorus90.901 %85.673 %differs
North subdivision: Retention removal, nitrogen80.200 %80.200 %same
North subdivision: Retention removal, phosphorus80.200 %80.200 %same
South subdivision: Retention removal, nitrogen81.280 %81.280 %same
South subdivision: Retention removal, phosphorus81.280 %81.280 %same
Town center: Wet Detention removal, nitrogen51.595 %41.595 %differs
Town center: Wet Detention removal, phosphorus82.596 %72.596 %differs

BMPFast 2 gives a different number for: Nitrogen leaving the site, Phosphorus leaving the site, Site removal, nitrogen, Site removal, phosphorus, Town center: Wet Detention removal, nitrogen, Town center: Wet Detention removal, phosphorus. See the notes below the table.

When BMPFast 2 opened the v1 file it said:

  • Town center, Wet Detention: BMPFast 2 takes the wet pond equations as a pond without a littoral zone, and adds a littoral zone credit of 10 percentage points (Appendix O's maximum) to this pond's removal, so it is higher than v1 shows; lower Littoral zone credit if your permit reviewer allows less. To calculate as v1, choose "Reduce without a littoral zone (v1)" in How the littoral zone counts (Design values) on the treatment's Entry tab.

4Check

Loads.

Each catchment’s load is EMC × runoff × 1.233 (Equation 9-2). Together:

TP 10.416 kg/yr (program 10.416).

A junction. Catchment 1 sends on 19.8 % of its TN and Catchment 2 sends on 18.7 % of its TN to Catchment 3 (what its basin does not capture). At a junction BMPFast adds what every input sends on to the node’s own load and runoff, recalculates the node’s BMP on that total, and passes the rest downstream (ComplexRouting; help page 220).

Node by node, upstream first (the junction rule).

  1. Catchment 1 (Retention): TN in = its own load, 19.060 kg/yr; its BMP, calculated on everything that reaches it, removes 80.20 %, so TN out = 19.060 × (1 − 80.20 / 100) = 3.774 kg/yr (program 3.774).
  2. Catchment 2 (Retention): TN in = its own load, 14.295 kg/yr; its BMP, calculated on everything that reaches it, removes 81.28 %, so TN out = 14.295 × (1 − 81.28 / 100) = 2.676 kg/yr (program 2.676).
  3. Catchment 3 (Wet Detention): TN in = own load 29.592 + 3.774 from Catchment 1 + 2.676 from Catchment 2 = 36.042 kg/yr; its BMP, calculated on everything that reaches it, removes 51.59 %, so TN out = 36.042 × (1 − 51.59 / 100) = 17.446 kg/yr (program 17.446). The pond’s inflow is its own runoff 10.000 ac-ft/yr plus what each retention basin does not capture: 8.733 × (1 − 80.20 / 100) + 6.550 × (1 − 81.28 / 100) = 12.955 ac-ft/yr (program 12.955); ART = 3 × 365 / 12.955 = 84.5 days (program 84.5), and the Appendix O pond equations at that ART give the 51.59 %.

The outlet receives Catchment 3: TN 17.446 kg/yr.

The standard is not met, and that is expected. “All sites non-exempted” requires the greater of 55 % TN and 80 % TP, or the removal that keeps the post-development load at the pre-development load (Equation 9-3) (AH Vol I 8.3.2). The post = pre removal (Equation 9-3, (post load − pre load) / post load) is TN 85.6 % and TP 82.9 %. BMPFast takes the larger of the standard’s percentage and the post = pre removal as the Maximum % Removal, shown on every worksheet’s status bar and in the Summary Report: here TN 85.6 % and TP 82.9 %. This problem shows what this design removes (72.3 % / 90.9 %), which is less. To meet it, add BMPs in series or downstream catchments (see BMPs in Series and Routing), or size the BMP (see Sizing).

5Files

6Help and methodology

Calculated with BMPFast 2 version 2.0.0 (2026-10-20), which opens the problem’s v1 project as it is. Screen captures are of BMPFast 2’s own window and are for demonstration only.