1The problem
A 3-acre commercial site discharging to an impaired water filters 1.0 in of runoff through B&G CTS24 media.
| Input | Value | Source |
|---|---|---|
| Project (General Site Information) | ||
| Meteorological zone | Florida Zone 3 | Zone map (help page 815) |
| Mean annual rainfall | 54 in | Mean annual rainfall map (help page 815) |
| Performance standard (analysis type) | Impaired Water | Site (illustrative) |
| Catchment 1: Commercial site (Watershed Characteristics) | ||
| Land use, pre / post | Undeveloped - Mesic Flatwoods / High-Intensity Commercial | Site (illustrative) |
| Area, pre / post | 3 / 3 ac | Site (illustrative) |
| Non-DCIA curve number, pre / post | 70 / 80 | Site (illustrative) |
| DCIA, pre / post | 0 / 70 % | Site (illustrative) |
| EMC TN, pre / post | 1.087 / 2.400 mg/L | BMPFast land use table (AH Vol I Table 9.2) |
| EMC TP, pre / post | 0.043 / 0.345 mg/L | BMPFast land use table (AH Vol I Table 9.2) |
| Media mix | B&G CTS24 (TN 75 %, TP 95 %) | BMPFast media table (help page 817) |
| Filtration System (worksheet) | ||
| Treatment Depth | 1.0 in | Design (illustrative) |
Find: the TN and TP removal of the BMP, the loads leaving the site, and whether the performance standard is met.
2Steps in BMPFast 2
Start BMPFast 2 and choose File ▸ New project. The tree on the left opens on the project (General Site Information). On its Entry tab enter: Project name Surface discharge filter: B_G CTS24, impaired water; Meteorological zone Florida Zone 3; Mean annual rainfall 54.00 in; Type of analysis Impaired Water; Conduct groundwater discharge analysis Yes. (To follow along with the finished project instead, choose File ▸ Open and open
filter-cts24-impaired.bmpffrom Files below.)
General Site Information: the project’s Entry tab. Press Add Catchment (left). Select the new catchment in the tree; on its Entry tab type the name Commercial site and enter: Land use (pre) Undeveloped - Mesic Flatwoods; Land use (post) High-Intensity Commercial; Area (pre) 3.00 ac; Area (post) 3.00 ac; Non-DCIA curve number (pre) 70.00; Non-DCIA curve number (post) 80.00; DCIA (post) 70.00 %. Leave the other boxes as they are (0 or blank). BMPFast 2 calculates as you type; scroll down to Calculated for the results after development: Annual runoff coefficient (ROC) (post) 0.596; Runoff volume (post) 8.046 ac-ft/yr; Nitrogen load (post) 23.810 kg/yr; Phosphorus load (post) 3.423 kg/yr.

The catchment Commercial site: its Entry tab. With Commercial site selected, press Add Treatment and choose Surface Discharge Filter. On its Entry tab type the Treatment name Surface Discharge Filter (BMPFast 2 starts it as “Surface Discharge Filter 1”) and enter: Treatment depth 1.00 in; Media mix B&G CTS24; Is the media design residence time more than 2 hours? Yes; Media nitrogen reduction 75.00 %; Media phosphorus reduction 95.00 %. The results are calculated as you type: Hydraulic capture 71.10 %; Nitrogen removal provided 53.33 %; Phosphorus removal provided 67.54 %.

The treatment Surface Discharge Filter: its Entry tab. Open the treatment’s Report tab: its inputs and removal, as a report to print or save.

The treatment Surface Discharge Filter: its Report tab. Press Add Routing (left). BMPFast 2 adds Routing 1 under Catchment Routings, with every catchment draining to the outlet and no treatment; a project can have several routings, compared side by side. On its Entry tab (How the routing is calculated Strand routing (v1's routing; use this for permits)) set each catchment as in this table:
Catchment Drains to Treatment used Commercial site Outlet Surface Discharge Filter A catchment is treated only by the treatment its routing uses.

The routing’s Entry tab: where each catchment drains and the treatment it uses. Open the routing’s Report tab. Results shows the loads leaving the site, the removal provided and required, and whether the performance standard is met; the list at the top of the tab has v1’s reports for the same routing (Summary, Complete, Flow Balance, AH Vol I Sec 9 compliance). Save the project with File ▸ Save; compare it with the .bmpf under Files.

The routing’s Report tab: Results.
3Results
| Result | Value |
|---|---|
| Catchment 1: computed by BMPFast | |
| Annual runoff coefficient (ROC), pre / post | 0.078 / 0.596 |
| Runoff, pre / post | 1.053 / 8.046 ac-ft/yr |
| TN load, pre / post | 1.411 / 23.810 kg/yr |
| TP load, pre / post | 0.056 / 3.423 kg/yr |
| Filtration: computed by BMPFast | |
| Treatment depth | 1.000 in |
| Hydraulic capture efficiency | 71.10 % |
| Provided TN / TP removal | 53.33 % / 67.54 % |
| TN load in → out | 23.810 → 11.113 kg/yr |
| TP load in → out | 3.423 → 1.111 kg/yr |
| Site (all catchments, at the outlet) | |
| TN load: catchments → outlet | 23.810 → 11.113 kg/yr |
| TP load: catchments → outlet | 3.423 → 1.111 kg/yr |
| Provided removal TN / TP | 53.3 % / 67.5 % |
| Required removal TN / TP (Maximum % Removal) | 94.1 % (not met) / 98.4 % (not met) |
The BMP report
Open this report on its own page.
The Summary Report
Open this report on its own page.
BMPFast 2 and BMPFast (v1)
| Result | BMPFast 2 | BMPFast (v1), its page | |
|---|---|---|---|
| Nitrogen leaving the site | 11.113 kg/yr | 11.113 kg/yr | same |
| Phosphorus leaving the site | 1.111 kg/yr | 1.111 kg/yr | same |
| Site removal, nitrogen | 53.325 % | 53.325 % | same |
| Site removal, phosphorus | 67.545 % | 67.545 % | same |
| Commercial site: Filtration removal, nitrogen | 53.325 % | 53.325 % | same |
| Commercial site: Filtration removal, phosphorus | 67.545 % | 67.545 % | same |
Every number BMPFast 2 gives for this problem is the same as BMPFast (v1)’s, to three decimals.
4Check
Runoff and loads (Equations 9-1 and 9-2 of AH Vol I).
| Runoff | = ROC × area × rainfall / 12 |
| = 0.596 × 3.00 ac × 54.0 in / 12 | |
| = 8.046 ac-ft/yr (program 8.046). |
| TN load | = EMC × runoff × 1.233 |
| = 2.400 × 8.046 × 1.233 | |
| = 23.810 kg/yr (program 23.810) |
| TP load | = 0.345 × 8.046 × 1.233 |
| = 3.423 kg/yr (program 3.423). |
1.233 kg is 1 mg/L in 1 ac-ft.
Capture. The retention efficiency tables for Florida Zone 3 at a treatment depth of 1.000 in, non-DCIA CN 80.00 and DCIA 70.0 % give a hydraulic capture of 71.10 % (AH Vol I Appendix O; read the same tables with Calculators ▸ Retention Efficiency Tables, help page 4325).
Removal.
The water captured passes through the media and leaves as surface discharge, so removal = capture × media reduction:
| TN | = 71.10 × 75 / 100 |
| = 53.33 % (program 53.33) |
| TP | = 71.10 × 95 / 100 |
| = 67.54 % (program 67.54). |
The media reductions are those of B&G CTS24 (Media and Filtration Methodology).
Load out.
| TN out | = load in × (1 − removal) |
| = 23.810 × (1 − 53.33 / 100) | |
| = 11.113 kg/yr (program 11.113) |
| TP out | = 3.423 × (1 − 67.54 / 100) |
| = 1.111 kg/yr (program 1.111). |
The standard is not met, and that is expected. “Impaired Water” requires 80 % TN and 80 % TP, and the post-development load not above the pre-development load, for a discharge to an impaired water (AH Vol I 8.3.4(a)). The post = pre removal (Equation 9-3, (post load − pre load) / post load) is TN 94.1 % and TP 98.4 %. BMPFast takes the larger of the standard’s percentage and the post = pre removal as the Maximum % Removal, shown on every worksheet’s status bar and in the Summary Report: here TN 94.1 % and TP 98.4 %. This problem shows what this design removes (53.3 % / 67.5 %), which is less. To meet it, add BMPs in series or downstream catchments (see BMPs in Series and Routing), or size the BMP (see Sizing).
The program’s Equations page
5Files
- filter-cts24-impaired.bmpf: the project, saved by BMPFast 2. Save it (your browser puts it in Downloads), then in BMPFast 2 choose File ▸ Open and open it. Opened again and calculated, it gives the numbers on this page.
- filter-cts24-impaired.bmpt: the same project as BMPFast (v1) saved it. BMPFast 2 opens it too (File ▸ Open); saving it then makes a .bmpf and leaves the .bmpt as it was.
- Routing 1 (BMPFast 2’s report, as Open in browser on its Report tab gives it)
- Routing 1 — Summary Report (BMPFast 2’s report, as Open in browser on its Report tab gives it)
- Surface Discharge Filter (BMPFast 2’s report, as Open in browser on its Report tab gives it)
- Surface Discharge Filter — calculations (BMPFast 2’s report, as Open in browser on its Report tab gives it)
6Help and methodology
Calculated with BMPFast 2 version 2.0.0 (2026-10-20), which opens the problem’s v1 project as it is. Screen captures are of BMPFast 2’s own window and are for demonstration only.