All programs › BMPFast › Sample problems
Surface discharge filter with B&G CTS24 for an impaired water
A 1.0-inch treatment depth through B&G CTS24; Impaired Water, Zone 3.
Help: Surface Discharge Filter (help page 346) · Download the .bmpt · Link to Solution in BMPFast Version 2
1The problem
A 3-acre commercial site discharging to an impaired water filters 1.0 in of runoff through B&G CTS24 media.
| Input | Value | Source |
|---|---|---|
| Project (General Site Information) | ||
| Meteorological zone | Florida Zone 3 | Zone map (help page 815) |
| Mean annual rainfall | 54 in | Mean annual rainfall map (help page 815) |
| Performance standard (analysis type) | Impaired Water | Site (illustrative) |
| Catchment 1: Commercial site (Watershed Characteristics) | ||
| Land use, pre / post | Undeveloped - Mesic Flatwoods / High-Intensity Commercial | Site (illustrative) |
| Area, pre / post | 3 / 3 ac | Site (illustrative) |
| Non-DCIA curve number, pre / post | 70 / 80 | Site (illustrative) |
| DCIA, pre / post | 0 / 70 % | Site (illustrative) |
| EMC TN, pre / post | 1.087 / 2.400 mg/L | BMPFast land use table (AH Vol I Table 9.2) |
| EMC TP, pre / post | 0.043 / 0.345 mg/L | BMPFast land use table (AH Vol I Table 9.2) |
| Media mix | B&G CTS24 (TN 75 %, TP 95 %) | BMPFast media table (help page 817) |
| Filtration System (worksheet) | ||
| Treatment Depth | 1.0 in | Design (illustrative) |
Find: the TN and TP removal of the BMP, the loads leaving the site, and whether the performance standard is met.
2Steps in BMPFast
Press New Project. On General Site Information (the main window; its title bar reads General Site Information and your license key) type the project name Surface discharge filter: B&G CTS24, impaired water, choose Florida Zone 3, enter 54 in of mean annual rainfall and choose the performance standard Impaired Water.

General Site Information (the main window). Press 1. Enter Catchment. For Catchment 1 type the name Commercial site, choose the land uses Undeveloped - Mesic Flatwoods (pre) and High-Intensity Commercial (post), enter the areas 3 and 3 ac, the non-DCIA curve numbers 70 and 80 and the DCIA 0 and 70 %, then press Calculate. BMPFast shows the annual runoff coefficient, the runoff and the TN and TP loads. Press Back.

Watershed Characteristics Worksheet (1. Enter Catchment). Press 2. Enter Treatment, then Surface Discharge Filter, and on its worksheet press Media. Choose B&G CTS24 (TN 75 %, TP 95 % when all the runoff is treated) and press Back.

Enter Media Mix Information (the Media button). Press 2. Enter Treatment and then Surface Discharge Filter. On the Filtration System worksheet: Treatment Depth 1.0 in. Press Calculate. The report on the worksheet shows the inputs and the results.

The BMP worksheet after Calculate: the report on the left. Press the same button again, now labelled Equations: the worksheet shows each equation with this problem’s values. Press Back to return to the treatment options.

The same worksheet showing Equations: each equation with this problem’s values. On the main window press 3. Configure Catchments and double-click Catchment 1. Choose Filtration as the BMP used in routing and the Outlet as where it goes. Press Back twice. (A catchment’s BMP is only used once it is chosen here.)

Routing for Catchment 1 (3. Configure Catchments): the BMP used and where the catchment goes. Press 4. Summary Report. The Report Viewer shows the loads, the removal and whether the performance standard is met. Press Save Project to keep your copy; compare it with the .bmpt under Files.

The Summary Report (4. Summary Report) in the Report Viewer.
3Results
| Result | Value |
|---|---|
| Catchment 1: computed by BMPFast | |
| Annual runoff coefficient (ROC), pre / post | 0.078 / 0.596 |
| Runoff, pre / post | 1.053 / 8.046 ac-ft/yr |
| TN load, pre / post | 1.411 / 23.810 kg/yr |
| TP load, pre / post | 0.056 / 3.423 kg/yr |
| Filtration: computed by BMPFast | |
| Treatment depth | 1.000 in |
| Hydraulic capture efficiency | 71.10 % |
| Provided TN / TP removal | 53.33 % / 67.54 % |
| TN load in → out | 23.810 → 11.113 kg/yr |
| TP load in → out | 3.423 → 1.111 kg/yr |
| Site (all catchments, at the outlet) | |
| TN load: catchments → outlet | 23.810 → 11.113 kg/yr |
| TP load: catchments → outlet | 3.423 → 1.111 kg/yr |
| Provided removal TN / TP | 53.3 % / 67.5 % |
| Required removal TN / TP (Maximum % Removal) | 94.1 % (not met) / 98.4 % (not met) |
The BMP report
Open this report on its own page.
The Summary Report
4Check
Runoff and loads (Equations 9-1 and 9-2 of AH Vol I).
| Runoff | = ROC × area × rainfall / 12 |
| = 0.596 × 3.00 ac × 54.0 in / 12 | |
| = 8.046 ac-ft/yr (program 8.046). |
| TN load | = EMC × runoff × 1.233 |
| = 2.400 × 8.046 × 1.233 | |
| = 23.810 kg/yr (program 23.810) |
| TP load | = 0.345 × 8.046 × 1.233 |
| = 3.423 kg/yr (program 3.423). |
1.233 kg is 1 mg/L in 1 ac-ft.
Capture. The retention efficiency tables for Florida Zone 3 at a treatment depth of 1.000 in, non-DCIA CN 80.00 and DCIA 70.0 % give a hydraulic capture of 71.10 % (AH Vol I Appendix O; read the same tables with Tools › Retention Efficiency Lookup Tables, help page 4325).
Removal.
The water captured passes through the media and leaves as surface discharge, so removal = capture × media reduction:
| TN | = 71.10 × 75 / 100 |
| = 53.33 % (program 53.33) |
| TP | = 71.10 × 95 / 100 |
| = 67.54 % (program 67.54). |
The media reductions are those of B&G CTS24 (Media and Filtration Methodology).
Load out.
| TN out | = load in × (1 − removal) |
| = 23.810 × (1 − 53.33 / 100) | |
| = 11.113 kg/yr (program 11.113) |
| TP out | = 3.423 × (1 − 67.54 / 100) |
| = 1.111 kg/yr (program 1.111). |
The standard is not met, and that is expected. “Impaired Water” requires 80 % TN and 80 % TP, and the post-development load not above the pre-development load, for a discharge to an impaired water (AH Vol I 8.3.4(a)). The post = pre removal (Equation 9-3, (post load − pre load) / post load) is TN 94.1 % and TP 98.4 %. BMPFast takes the larger of the standard’s percentage and the post = pre removal as the Maximum % Removal, shown on every worksheet’s status bar and in the Summary Report: here TN 94.1 % and TP 98.4 %. This problem shows what this design removes (53.3 % / 67.5 %), which is less. To meet it, add BMPs in series or downstream catchments (see BMPs in Series and Routing), or size the BMP (see Sizing).
The program’s Equations page
5Files
- filter-cts24-impaired.bmpt: the project, saved by BMPFast. Save it (your browser puts it in Downloads). In BMPFast press Open Project, then Open Project again in the Open BMPFast Project dialog (below its Recent Projects list), and choose the file.
- Equations page (worksheet) (as BMPFast shows it)
- Summary Report (as BMPFast shows it)
- BMP report (worksheet) (as BMPFast shows it)
6Help and methodology
Calculated with BMPFast 1.1.9 (build 6.0.0, 2026-10-16). Older versions may not have the Equations button or may give slightly different results; download the latest at bmpfast.com. Screen captures are for demonstration only.