1The problem

The BMPFast sample project Detention in series, 2020 TAC manual page 194 (three catchments with wet ponds in series, Zone 4, All sites non-exempted). Print the compliance report laid out like the ERP Applicant’s Handbook Vol I, Section 9.

InputValueSource
Project (General Site Information)
Meteorological zoneFlorida Zone 4Zone map (help page 815)
Mean annual rainfall52 inMean annual rainfall map (help page 815)
Performance standard (analysis type)All sites non-exemptedBMPFast sample project
Catchment 1: upstream one (Watershed Characteristics)
Land use, pre / postAgricultural - Citrus / User Defined ValuesBMPFast sample project
Area, pre / post20.75 / 20.75 acBMPFast sample project
Non-DCIA curve number, pre / post68.3 / 76.12BMPFast sample project
DCIA, pre / post0 / 17.9 %BMPFast sample project
EMC TN, pre / post2.110 / 1.816 mg/LBMPFast land use table (AH Vol I Table 9.2)
EMC TP, pre / post0.180 / 0.453 mg/LBMPFast land use table (AH Vol I Table 9.2)
Wet pond area (no loading)0.79 acBMPFast sample project
BMP used in routingWet Detention: permanent pool 1 ac-ft; Check if there is a littoral zone ticked; MAPs credit 0 %BMPFast sample project
Routes toCatchment 2BMPFast sample project
Catchment 2: Catchment 2 (Watershed Characteristics)
Land use, pre / postAgricultural - Citrus / User Defined ValuesBMPFast sample project
Area, pre / post25.13 / 25.13 acBMPFast sample project
Non-DCIA curve number, pre / post68.3 / 76.12BMPFast sample project
DCIA, pre / post0 / 17.8 %BMPFast sample project
EMC TN, pre / post2.110 / 1.715 mg/LBMPFast land use table (AH Vol I Table 9.2)
EMC TP, pre / post0.180 / 0.407 mg/LBMPFast land use table (AH Vol I Table 9.2)
Wet pond area (no loading)1.55 acBMPFast sample project
BMP used in routingWet Detention: permanent pool 1.25 ac-ft; Check if there is a littoral zone ticked; MAPs credit 0 %BMPFast sample project
Routes toCatchment 3BMPFast sample project
Catchment 3: Catchment 0 (Watershed Characteristics)
Land use, pre / postAgricultural - Citrus / User Defined ValuesBMPFast sample project
Area, pre / post37.41 / 37.41 acBMPFast sample project
Non-DCIA curve number, pre / post68.3 / 84BMPFast sample project
DCIA, pre / post0 / 19 %BMPFast sample project
EMC TN, pre / post2.110 / 1.816 mg/LBMPFast land use table (AH Vol I Table 9.2)
EMC TP, pre / post0.180 / 0.453 mg/LBMPFast land use table (AH Vol I Table 9.2)
Wet pond area (no loading)1.70 acBMPFast sample project
BMP used in routingWet Detention: permanent pool 2.5 ac-ft; Check if there is a littoral zone unticked; MAPs credit 0 %BMPFast sample project
Routes tothe OutletBMPFast sample project

Find: what each report shows and where its numbers come from.

2Steps in BMPFast

  1. Press Open Project and open reports-ahvi-compliance.bmpt (the file under Files; it is the BMPFast sample project Detention Multiple catchments 2020 Manual pages 190 196.bmpt). General Site Information (the main window; its title bar reads General Site Information and your license key) shows Florida Zone 4, 52.0 in of rainfall and the performance standard All sites non-exempted.

    General Site Information (the main window).
    General Site Information (the main window).
  2. Press 1. Enter Catchment and click Catchment 1 in the menu bar at the top of the Watershed Characteristics Worksheet. It holds: name upstream one; land uses Agricultural - Citrus (pre) and User Defined Values (post); areas 20.75 and 20.75 ac; non-DCIA CN 68.3 and 76.12; DCIA 0 and 17.9 %. Press Back.

  3. On the Watershed Characteristics Worksheet click Catchment 2 in the menu bar: name Catchment 2; land uses Agricultural - Citrus (pre) and User Defined Values (post); areas 25.13 and 25.13 ac; non-DCIA CN 68.3 and 76.12; DCIA 0 and 17.8 %.

  4. On the Watershed Characteristics Worksheet click Catchment 3 in the menu bar: name Catchment 0; land uses Agricultural - Citrus (pre) and User Defined Values (post); areas 37.41 and 37.41 ac; non-DCIA CN 68.3 and 84; DCIA 0 and 19 %.

  5. Press 2. Enter Treatment, click Catchment 1 in the menu bar to make it current, and press Wet Detention to see its BMP: permanent pool 1 ac-ft; Check if there is a littoral zone ticked; MAPs credit 0 %. Press Calculate, then Back.

  6. Press 2. Enter Treatment, click Catchment 2 in the menu bar to make it current, and press Wet Detention to see its BMP: permanent pool 1.25 ac-ft; Check if there is a littoral zone ticked; MAPs credit 0 %. Press Calculate, then Back.

  7. Press 2. Enter Treatment, click Catchment 3 in the menu bar to make it current, and press Wet Detention to see its BMP: permanent pool 2.5 ac-ft; Check if there is a littoral zone unticked; MAPs credit 0 %. Press Calculate, then Back.

  8. On the main window press 3. Configure Catchments. in the row of Catchment 1 press Edit (the Routing Catchment From: 1 window opens). In Select BMP to use in routing choose Wet Detention; in Select Catchment to Route to choose Catchment 2. Press Back.

  9. Back on Select Catchment Configuration, in the row of Catchment 2 press Edit (the Routing Catchment From: 2 window opens). In Select BMP to use in routing choose Wet Detention; in Select Catchment to Route to choose Catchment 3. Press Back.

  10. Back on Select Catchment Configuration, in the row of Catchment 3 press Edit (the Routing Catchment From: 3 window opens). In Select BMP to use in routing choose Wet Detention; in Select Catchment to Route to choose the Outlet. Press Back (Back again closes Select Catchment Configuration).

  11. Press 8. Custom Reports and choose AH Vol 1, Sec 9, App M-O. The report follows Table 9.1, Equations 9-1 to 9-5 and Appendices M to O. Press Save Project to keep your copy; compare it with the .bmpt under Files.

    The AH Vol 1, Sec 9 compliance report (8. Custom Reports).
    The AH Vol 1, Sec 9 compliance report (8. Custom Reports).

3Results

ResultValue
Site (all catchments, at the outlet)
TN load: catchments → outlet197.210 → 113.730 kg/yr
TP load: catchments → outlet48.587 → 16.166 kg/yr
Provided removal TN / TP42.3 % / 66.7 %
Required removal TN / TP (Maximum % Removal)68.9 % (not met) / 89.2 % (not met)

The AH Vol I Section 9 compliance report

Open this report on its own page.

The Summary Report

Open this report on its own page.

4Check

Nothing is recalculated. The compliance report re-presents the project’s inputs and results in the Handbook’s order and terms; apart from unit conversions (kg and lb) its numbers are those of the Summary and Complete reports: outlet TN 113.730 kg/yr (250.732 lb/yr) and TP 16.166 kg/yr (help page 813).

5Files

6Help and methodology

Calculated with BMPFast 1.1.9 (build 6.0.0, 2026-10-16). Older versions may not have the Equations button or may give slightly different results; download the latest at bmpfast.com. Screen captures are for demonstration only.