1The problem
The BMPFast sample project Example Problem 3 (11 ac, Zone 4, specified removal 75 / 75 %). Find the retention volume that meets the targets, then the volume for 85 %.
| Input | Value | Source |
|---|---|---|
| Project (General Site Information) | ||
| Meteorological zone | Florida Zone 4 | Zone map (help page 815) |
| Mean annual rainfall | 50 in | Mean annual rainfall map (help page 815) |
| Performance standard (analysis type) | Specified Removal Efficiency | BMPFast sample project |
| Specified removal: TN / TP | 75 % / 75 % | BMPFast sample project |
| Catchment 1: catchment 1 (Watershed Characteristics) | ||
| Land use, pre / post | Agricultural - Pasture / Single-Family | BMPFast sample project |
| Area, pre / post | 11 / 11 ac | BMPFast sample project |
| Non-DCIA curve number, pre / post | 50 / 65 | BMPFast sample project |
| DCIA, pre / post | 0 / 25 % | BMPFast sample project |
| EMC TN, pre / post | 3.030 / 1.770 mg/L | BMPFast land use table (AH Vol I Table 9.2) |
| EMC TP, pre / post | 0.593 / 0.327 mg/L | BMPFast land use table (AH Vol I Table 9.2) |
Find: the Retention Volume that meets the removal targets: first the targets of the performance standard, then the new targets named, and apply it.
2Steps in BMPFast
Press Open Project and open
sizing-retention.bmpt(the file under Files; it is the BMPFast sample project Example Problem 3.bmpt). General Site Information (the main window; its title bar reads General Site Information and your license key) shows Florida Zone 4, 50.0 in of rainfall and the performance standard Specified Removal Efficiency.
General Site Information (the main window). Open the Retention worksheet (2. Enter Treatment, Retention) and press Calculate: the design as it stands.

The worksheet before sizing. Press Sizing. The window plots TN and TP removal against the Retention Volume, with the targets (the Maximum % Removal of the performance standard) and the value where both are met.

The Sizing window at the targets of the performance standard. Type new targets in Removal targets and press Use: the design moves to the value that meets them. Press Apply to keep it.

The Sizing window at the new targets, after Use. Back on the worksheet, the applied value is in the box and the report is recalculated. Press Save Project to keep your copy; compare it with the .bmpt under Files.

The BMP worksheet after Calculate: the report on the left.
3Results
The Sizing window, at the program’s targets:
- Current removal: N = 75.0% P = 75.0% — meets both targets
- Retention Volume at which both targets are met: 0.506 ac-ft
- Treatment Depth (Retention Depth): 0.55 in over contributing area
At the new targets, after Use:
- Current removal: N = 85.0% P = 85.0% — meets both targets
- Retention Volume at which both targets are met: 0.862 ac-ft
- Treatment Depth (Retention Depth): 0.94 in over contributing area
| Result after Apply | Value |
|---|---|
| Retention: computed by BMPFast | |
| Treatment depth | 0.940 in |
| Hydraulic capture efficiency | 85.00 % |
| Provided TN / TP removal | 85.00 % / 85.00 % |
| TN load in → out | 24.607 → 3.691 kg/yr |
| TP load in → out | 4.546 → 0.682 kg/yr |
| Site (all catchments, at the outlet) | |
| TN load: catchments → outlet | 24.607 → 3.691 kg/yr |
| TP load: catchments → outlet | 4.546 → 0.682 kg/yr |
| Provided removal TN / TP | 85.0 % / 85.0 % |
| Required removal TN / TP (Maximum % Removal) | 75.0 % (met) / 75.0 % (met) |
The Summary Report
4Check
Runoff and loads (Equations 9-1 and 9-2 of AH Vol I).
| Runoff | = ROC × area × rainfall / 12 |
| = 0.246 × 11.00 ac × 50.0 in / 12 | |
| = 11.275 ac-ft/yr (program 11.275). |
| TN load | = EMC × runoff × 1.233 |
| = 1.770 × 11.275 × 1.233 | |
| = 24.607 kg/yr (program 24.607) |
| TP load | = 0.327 × 11.275 × 1.233 |
| = 4.546 kg/yr (program 4.546). |
1.233 kg is 1 mg/L in 1 ac-ft.
Treatment depth.
| Depth | = retention volume × 12 / area |
| = 0.8619 ac-ft × 12 / 11.00 ac | |
| = 0.940 in (program 0.940). |
Capture. The retention efficiency tables for Florida Zone 4 at a treatment depth of 0.940 in, non-DCIA CN 65.00 and DCIA 25.0 % give a hydraulic capture of 85.00 % (AH Vol I Appendix O; read the same tables with Tools › Retention Efficiency Lookup Tables, help page 4325). Sizing found the volume whose capture meets the targets; the worksheet, calculated at that volume, gives the same removal.
Load out.
| TN out | = load in × (1 − removal) |
| = 24.607 × (1 − 85.00 / 100) | |
| = 3.691 kg/yr (program 3.691) |
| TP out | = 4.546 × (1 − 85.00 / 100) |
| = 0.682 kg/yr (program 0.682). |
5Files
- sizing-retention.bmpt: the project, saved by BMPFast. Save it (your browser puts it in Downloads). In BMPFast press Open Project, then Open Project again in the Open BMPFast Project dialog (below its Recent Projects list), and choose the file.
- Summary Report (as BMPFast shows it)
- BMP report (worksheet) (as BMPFast shows it)
6Help and methodology
Calculated with BMPFast 1.1.9 (build 6.0.0, 2026-10-16). Older versions may not have the Equations button or may give slightly different results; download the latest at bmpfast.com. Screen captures are for demonstration only.