All programs › BMPFast › Sample problems
Cost analysis: a retention basin
Example Problem 3’s basin: the worked example of the Cost Analysis Methodology.
Help: Cost Analysis (help page 350) · Download the .bmpt · Link to Solution in BMPFast Version 2
1The problem
The BMPFast sample project Example Problem 3: the retention basin ($100,000 – $150,000, 20-year life, O&M 1.0 – 6.0 %), its fixed outlet structure ($10,000 – $15,000, 60 years) and mowing twice a year. Discount rate 3.3 %, 30 years, inflation 2.5 %.
| Input | Value | Source |
|---|---|---|
| Project (General Site Information) | ||
| Meteorological zone | Florida Zone 4 | Zone map (help page 815) |
| Mean annual rainfall | 50 in | Mean annual rainfall map (help page 815) |
| Performance standard (analysis type) | Specified Removal Efficiency | BMPFast sample project |
| Specified removal: TN / TP | 75 % / 75 % | BMPFast sample project |
| Cost analysis | ||
| Discount rate | 3.3 % | Cost analysis parameters |
| Duration | 30 years | Cost analysis parameters |
| BMP inflation rate | 2.5 % | Cost analysis parameters |
Find: the present worth, the annual cost and the cost per pound of TN and TP removed.
2Steps in BMPFast
Press 6. Cost Analysis. The hub lists every catchment’s BMP; set the discount rate and duration in A.

The Cost Analysis hub (6. Cost Analysis). Double-click the Retention row. In B enter the components (construction low and high, life, O&M %), in C the routine costs, in D the energy; press Calculate.

Cost analysis of one BMP: A parameters and B components. Collapse B and open C: the routine maintenance costs, here with the Stormwater Resale credit where there is one (a negative cost). Open E for the summary: present worth, annual cost and cost per pound (the results below).

The same window with C open: the routine maintenance costs. Back on the hub, Full Cost Report shows the costs of every BMP. Press Save Project to keep your copy; compare it with the .bmpt under Files.

The Full Cost Report.
3Results
| Result (low – high) | Value |
|---|---|
| Construction | $110,000 – $165,000 |
| Present value of replacements | $85,599 – $128,399 |
| Present value of O&M | $88,707 – $240,675 |
| Present worth | $284,306 – $534,074 |
| Annualized cost | $15,073 – $28,315 |
| Cost per lb TN removed | $232.87 – $437.45 |
| Cost per lb TP removed | $1,260.48 – $2,367.83 |
| TN / TP removed | 40.70 / 7.52 lb/yr |
The component cost report
Open this report on its own page.
Full Cost Report
4Check
| Present worth | = construction + PV of replacements + PV of O&M |
| = 110,000 + 85,599 + 88,707 | |
| = $284,306 (low; program $284,306). |
Annualized cost.
| CRF (capital recovery factor) | = i(1+i)N / ((1+i)N − 1) |
| = 0.05302 (i = 3.3 %, N = 30 years). |
| Annualized cost | = present worth × CRF |
| = 284,306 × 0.05302 | |
| = $15,073 a year (program $15,073). |
| Cost per pound | = present worth / (pounds removed a year × years) |
| = 284,306 / (40.70 lb/yr × 30) | |
| = $232.87 per lb TN (program $232.87) (Cost Analysis Methodology). |
5Files
- cost-retention-basin.bmpt: the project, saved by BMPFast. Save it (your browser puts it in Downloads). In BMPFast press Open Project, then Open Project again in the Open BMPFast Project dialog (below its Recent Projects list), and choose the file.
- Component cost report (as BMPFast shows it)
- Full Cost Report (as BMPFast shows it)
- Summary Report (as BMPFast shows it)
- BMP report (worksheet) (as BMPFast shows it)
6Help and methodology
Calculated with BMPFast 1.1.9 (build 6.0.0, 2026-10-16). Older versions may not have the Equations button or may give slightly different results; download the latest at bmpfast.com. Screen captures are for demonstration only.