1The problem

A 10-acre pasture becomes a single-family subdivision in Zone 2. Its wet pond has a 3.0 ac-ft permanent pool and a littoral zone. Under the performance standard Impaired Water + OFW, the program requires 95 % TN and 95 % TP, and post not above pre, where the HUC 12 has both an impaired water and an OFW (AH Vol I 8.3.4(a)). Every analysis type uses the same site and pond, so the problems can be compared side by side.

InputValueSource
Project (General Site Information)
Meteorological zoneFlorida Zone 2Zone map (help page 815)
Mean annual rainfall50 inMean annual rainfall map (help page 815)
Performance standard (analysis type)Impaired Water + OFWSite (illustrative)
Catchment 1: Subdivision (Watershed Characteristics)
Land use, pre / postAgricultural - Pasture / Single-FamilySite (illustrative)
Area, pre / post10 / 10 acSite (illustrative)
Non-DCIA curve number, pre / post61 / 75Site (illustrative)
DCIA, pre / post0 / 25 %Site (illustrative)
EMC TN, pre / post3.030 / 1.770 mg/LBMPFast land use table (AH Vol I Table 9.2)
EMC TP, pre / post0.593 / 0.327 mg/LBMPFast land use table (AH Vol I Table 9.2)
Wet pond: permanent pool, littoral zone3.0 ac-ft, yesDesign (illustrative)

Find: the removal the standard requires, the removal provided, and whether the standard is met.

2Steps in BMPFast

  1. Press New Project. On General Site Information (the main window; its title bar reads General Site Information and your license key) type the project name Analysis type: Impaired Water + OFW, choose Florida Zone 2, enter 50 in of mean annual rainfall and choose the performance standard Impaired Water + OFW.

    General Site Information (the main window).
    General Site Information (the main window).
  2. Press 1. Enter Catchment. For Catchment 1 type the name Subdivision, choose the land uses Agricultural - Pasture (pre) and Single-Family (post), enter the areas 10 and 10 ac, the non-DCIA curve numbers 61 and 75 and the DCIA 0 and 25 %, then press Calculate. BMPFast shows the annual runoff coefficient, the runoff and the TN and TP loads. Press Back.

    Watershed Characteristics Worksheet (1. Enter Catchment).
    Watershed Characteristics Worksheet (1. Enter Catchment).
  3. Press 2. Enter Treatment and then Wet Detention. On the Wet Detention worksheet: Permanent Pool Volume 3.0 ac-ft; tick Check if there is a littoral zone; Floating Wetland or other MAPs Credit 0 %. Press Calculate. The report on the worksheet shows the inputs and the results.

    The BMP worksheet after Calculate: the report on the left.
    The BMP worksheet after Calculate: the report on the left.
  4. On the main window press 3. Configure Catchments and double-click Catchment 1. Choose Wet Detention as the BMP used in routing and the Outlet as where it goes. Press Back twice. (A catchment’s BMP is only used once it is chosen here.)

    Routing for Catchment 1 (3. Configure Catchments): the BMP used and where the catchment goes.
    Routing for Catchment 1 (3. Configure Catchments): the BMP used and where the catchment goes.
  5. Press 4. Summary Report. The Report Viewer shows the loads, the removal and whether the performance standard is met. Press Save Project to keep your copy; compare it with the .bmpt under Files.

    The Summary Report (4. Summary Report) in the Report Viewer.
    The Summary Report (4. Summary Report) in the Report Viewer.

3Results

ResultValue
Catchment 1: computed by BMPFast
Annual runoff coefficient (ROC), pre / post0.032 / 0.262
Runoff, pre / post1.350 / 10.917 ac-ft/yr
TN load, pre / post5.044 / 23.825 kg/yr
TP load, pre / post0.987 / 4.402 kg/yr
Wet Detention: computed by BMPFast
Annual residence time100.3 days
Hydraulic capture efficiency74.02 %
Provided TN / TP removal41.92 % / 74.02 %
TN load in → out23.825 → 13.837 kg/yr
TP load in → out4.402 → 1.144 kg/yr
Requirement (computed by BMPFast)
Specified by the standard, TN / TP95.0 % / 95.0 %
Post = pre removal, TN / TP78.83 % / 77.57 %
Maximum % Removal used (status bar), TN / TP95.00 % / 95.00 %
Site (all catchments, at the outlet)
TN load: catchments → outlet23.825 → 13.837 kg/yr
TP load: catchments → outlet4.402 → 1.144 kg/yr
Provided removal TN / TP41.9 % / 74.0 %
Required removal TN / TP (Maximum % Removal)95.0 % (not met) / 95.0 % (not met)

The Summary Report

Open this report on its own page.

4Check

Runoff and loads (Equations 9-1 and 9-2 of AH Vol I).

1.233 kg is 1 mg/L in 1 ac-ft.

Post = pre removal.

To bring the post-development load back to the pre-development load:

This standard does not compare with the pre-development load, so the required removal is the specified one.

Annual residence time.

Removal. The wet detention equations of AH Vol I Appendix O at 100.3 days, with a littoral zone, give TN 41.92 % and TP 74.02 %. The worksheet’s Equations page shows each equation with these numbers; the Wet Detention Methodology explains them.

Load out.

5Files

  • analysis-impaired-ofw.bmpt: the project, saved by BMPFast. Save it (your browser puts it in Downloads). In BMPFast press Open Project, then Open Project again in the Open BMPFast Project dialog (below its Recent Projects list), and choose the file.
  • Summary Report (as BMPFast shows it)
  • BMP report (worksheet) (as BMPFast shows it)

6Help and methodology

Calculated with BMPFast 1.1.9 (build 6.0.0, 2026-10-16). Older versions may not have the Equations button or may give slightly different results; download the latest at bmpfast.com. Screen captures are for demonstration only.