All programs › BMPFast › Sample problems
Tree wells along a street (retention)
Ten 8 × 8 ft tree wells; BMP Analysis, Zone 2.
Help: Tree Well (help page 807) · Download the .bmpt · Link to Solution in BMPFast Version 2
1The problem
A half-acre street and sidewalk drain to ten 8 ft × 8 ft tree wells, 3 ft deep, that infiltrate.
| Input | Value | Source |
|---|---|---|
| Project (General Site Information) | ||
| Meteorological zone | Florida Zone 2 | Zone map (help page 815) |
| Mean annual rainfall | 50 in | Mean annual rainfall map (help page 815) |
| Performance standard (analysis type) | BMP Analysis | Site (illustrative) |
| Catchment 1: Street (Watershed Characteristics) | ||
| Land use, pre / post | Undeveloped - Mesic Flatwoods / Low-Intensity Commercial | Site (illustrative) |
| Area, pre / post | 0.5 / 0.5 ac | Site (illustrative) |
| Non-DCIA curve number, pre / post | 70 / 80 | Site (illustrative) |
| DCIA, pre / post | 0 / 85 % | Site (illustrative) |
| EMC TN, pre / post | 1.087 / 0.930 mg/L | BMPFast land use table (AH Vol I Table 9.2) |
| EMC TP, pre / post | 0.043 / 0.190 mg/L | BMPFast land use table (AH Vol I Table 9.2) |
| Tree Well (worksheet) | ||
| Retention or Detention | Retention | Design (illustrative) |
| Vegetated area (tree well) depth | 3 ft | Design (illustrative) |
| Tree well storage (above media + canopy capture) | 0.5 ft | Design (illustrative) |
| Vegetated area width | 8 ft | Design (illustrative) |
| Vegetated area length | 8 ft | Design (illustrative) |
| Number of tree well areas | 10 | Design (illustrative) |
| Sustainable water storage capacity of the soil | 0.20 | Design (illustrative) |
Find: the TN and TP removal of the BMP, the loads leaving the site, and whether the performance standard is met.
2Steps in BMPFast
Press New Project. On General Site Information (the main window; its title bar reads General Site Information and your license key) type the project name Tree wells: retention, streetscape, choose Florida Zone 2, enter 50 in of mean annual rainfall and choose the performance standard BMP Analysis.

General Site Information (the main window). Press 1. Enter Catchment. For Catchment 1 type the name Street, choose the land uses Undeveloped - Mesic Flatwoods (pre) and Low-Intensity Commercial (post), enter the areas 0.5 and 0.5 ac, the non-DCIA curve numbers 70 and 80 and the DCIA 0 and 85 %, then press Calculate. BMPFast shows the annual runoff coefficient, the runoff and the TN and TP loads. Press Back.

Watershed Characteristics Worksheet (1. Enter Catchment). Press 2. Enter Treatment and then Tree Well. On the Tree Well worksheet: Retention or Detention Retention; Vegetated area (tree well) depth 3 ft; Tree well storage (above media + canopy capture) 0.5 ft; Vegetated area width 8 ft; Vegetated area length 8 ft; Number of tree well areas 10; Sustainable water storage capacity of the soil 0.20. Press Calculate. The report on the worksheet shows the inputs and the results.

The BMP worksheet after Calculate: the report on the left. Press the same button again, now labelled Equations: the worksheet shows each equation with this problem’s values. Press Back to return to the treatment options.

The same worksheet showing Equations: each equation with this problem’s values. On the main window press 3. Configure Catchments and double-click Catchment 1. Choose Tree Well as the BMP used in routing and the Outlet as where it goes. Press Back twice. (A catchment’s BMP is only used once it is chosen here.)

Routing for Catchment 1 (3. Configure Catchments): the BMP used and where the catchment goes. Press 4. Summary Report. The Report Viewer shows the loads, the removal and whether the performance standard is met. Press Save Project to keep your copy; compare it with the .bmpt under Files.

The Summary Report (4. Summary Report) in the Report Viewer.
3Results
| Result | Value |
|---|---|
| Catchment 1: computed by BMPFast | |
| Annual runoff coefficient (ROC), pre / post | 0.057 / 0.705 |
| Runoff, pre / post | 0.119 / 1.469 ac-ft/yr |
| TN load, pre / post | 0.159 / 1.684 kg/yr |
| TP load, pre / post | 0.006 / 0.344 kg/yr |
| Tree Well: computed by BMPFast | |
| Treatment depth | 1.128 in |
| Hydraulic capture efficiency | 75.99 % |
| Provided TN / TP removal | 75.99 % / 75.99 % |
| TN load in → out | 1.684 → 0.404 kg/yr |
| TP load in → out | 0.344 → 0.083 kg/yr |
| Site (all catchments, at the outlet) | |
| TN load: catchments → outlet | 1.684 → 0.404 kg/yr |
| TP load: catchments → outlet | 0.344 → 0.083 kg/yr |
| Provided removal TN / TP | 76.0 % / 76.0 % |
The BMP report
Open this report on its own page.
The Summary Report
4Check
Runoff and loads (Equations 9-1 and 9-2 of AH Vol I).
| Runoff | = ROC × area × rainfall / 12 |
| = 0.705 × 0.50 ac × 50.0 in / 12 | |
| = 1.469 ac-ft/yr (program 1.469). |
| TN load | = EMC × runoff × 1.233 |
| = 0.930 × 1.469 × 1.233 | |
| = 1.684 kg/yr (program 1.684) |
| TP load | = 0.190 × 1.469 × 1.233 |
| = 0.344 kg/yr (program 0.344). |
1.233 kg is 1 mg/L in 1 ac-ft.
Storage (as the program calculates it).
| Storage per area | = length × width × (depth + soil storage capacity) / 43,560 |
| = 8 × 8 × (3.00 + 0.20) / 43,560, times 10 areas | |
| = 0.0470 ac-ft (program 0.0470). |
The Tree Well Storage entered (0.50 ft) is not part of this equation; it is listed for review.
Treatment depth.
| Depth | = storage × 12 / area |
| = 0.0470 ac-ft × 12 / 0.50 ac | |
| = 1.128 in (program 1.128). |
Capture. The retention efficiency tables for Florida Zone 2 at a treatment depth of 1.128 in, non-DCIA CN 80.00 and DCIA 85.0 % give a hydraulic capture of 75.99 % (AH Vol I Appendix O; read the same tables with Tools › Retention Efficiency Lookup Tables, help page 4325). A retention tree well keeps what it captures: the removal equals the capture.
Load out.
| TN out | = load in × (1 − removal) |
| = 1.684 × (1 − 75.99 / 100) | |
| = 0.404 kg/yr (program 0.404) |
| TP out | = 0.344 × (1 − 75.99 / 100) |
| = 0.083 kg/yr (program 0.083). |
The program’s Equations page
5Files
- tree-well-retention.bmpt: the project, saved by BMPFast. Save it (your browser puts it in Downloads). In BMPFast press Open Project, then Open Project again in the Open BMPFast Project dialog (below its Recent Projects list), and choose the file.
- Equations page (worksheet) (as BMPFast shows it)
- Summary Report (as BMPFast shows it)
- BMP report (worksheet) (as BMPFast shows it)
6Help and methodology
Calculated with BMPFast 1.1.9 (build 6.0.0, 2026-10-16). Older versions may not have the Equations button or may give slightly different results; download the latest at bmpfast.com. Screen captures are for demonstration only.