Sizing a wet detention pond
All sites non-exempted cannot be met by a pond alone; the pool for 40 / 75 %.
Help: Sizing (help page 4637) · Download the .bmpt · Link to Solution in BMPFast Version 2
1The problem
A 10-acre subdivision in Zone 2 (All sites non-exempted) starts with a 2.0 ac-ft permanent pool. Can a pond alone meet the standard? Then find the pool for 40 % TN and 75 % TP.
| Input | Value | Source |
|---|---|---|
| Project (General Site Information) | ||
| Meteorological zone | Florida Zone 2 | Zone map (help page 815) |
| Mean annual rainfall | 50 in | Mean annual rainfall map (help page 815) |
| Performance standard (analysis type) | All sites non-exempted | Site (illustrative) |
| Catchment 1: Subdivision (Watershed Characteristics) | ||
| Land use, pre / post | Agricultural - Pasture / Single-Family | Site (illustrative) |
| Area, pre / post | 10 / 10 ac | Site (illustrative) |
| Non-DCIA curve number, pre / post | 61 / 75 | Site (illustrative) |
| DCIA, pre / post | 0 / 25 % | Site (illustrative) |
| EMC TN, pre / post | 3.030 / 1.770 mg/L | BMPFast land use table (AH Vol I Table 9.2) |
| EMC TP, pre / post | 0.593 / 0.327 mg/L | BMPFast land use table (AH Vol I Table 9.2) |
Find: the Permanent Pool Volume that meets the removal targets: first the targets of the performance standard, then the new targets named, and apply it.
2Steps in BMPFast
Press New Project. On General Site Information (the main window; its title bar reads General Site Information and your license key) type the project name Sizing: wet detention pond, choose Florida Zone 2, enter 50 in of mean annual rainfall and choose the performance standard All sites non-exempted.

General Site Information (the main window). Open the Wet Detention worksheet (2. Enter Treatment, Wet Detention) and press Calculate: the design as it stands.

The worksheet before sizing. On the main window press 3. Configure Catchments and double-click Catchment 1. Choose Wet Detention as the BMP used in routing and the Outlet as where it goes. Press Back twice. (A catchment’s BMP is only used once it is chosen here.)

Routing for Catchment 1 (3. Configure Catchments): the BMP used and where the catchment goes. Press Sizing. The window plots TN and TP removal against the Permanent Pool Volume, with the targets (the Maximum % Removal of the performance standard) and the value where both are met.

The Sizing window at the targets of the performance standard. Type new targets in Removal targets and press Use: the design moves to the value that meets them. Press Apply to keep it.

The Sizing window at the new targets, after Use. Back on the worksheet, the applied value is in the box and the report is recalculated. Press Save Project to keep your copy; compare it with the .bmpt under Files.

The BMP worksheet after Calculate: the report on the left.
3Results
The Sizing window, at the program’s targets:
- Current removal: N = 41.1% P = 70.7% — below target
At the new targets, after Use:
- Current removal: N = 42.1% P = 75.0% — meets both targets
- Permanent Pool Volume at which both targets are met: 3.37 ac-ft
| Result after Apply | Value |
|---|---|
| Wet Detention: computed by BMPFast | |
| Annual residence time | 112.8 days |
| Hydraulic capture efficiency | 70.67 % |
| Provided TN / TP removal | 42.12 % / 75.00 % |
| TN load in → out | 23.825 → 13.791 kg/yr |
| TP load in → out | 4.402 → 1.100 kg/yr |
| Site (all catchments, at the outlet) | |
| TN load: catchments → outlet | 23.825 → 13.791 kg/yr |
| TP load: catchments → outlet | 4.402 → 1.100 kg/yr |
| Provided removal TN / TP | 42.1 % / 75.0 % |
| Required removal TN / TP (Maximum % Removal) | 78.8 % (not met) / 80.0 % (not met) |
The Summary Report
4Check
Runoff and loads (Equations 9-1 and 9-2 of AH Vol I).
| Runoff | = ROC × area × rainfall / 12 |
| = 0.262 × 10.00 ac × 50.0 in / 12 | |
| = 10.917 ac-ft/yr (program 10.917). |
| TN load | = EMC × runoff × 1.233 |
| = 1.770 × 10.917 × 1.233 | |
| = 23.825 kg/yr (program 23.825) |
| TP load | = 0.327 × 10.917 × 1.233 |
| = 4.402 kg/yr (program 4.402). |
1.233 kg is 1 mg/L in 1 ac-ft.
Annual residence time.
| ART | = permanent pool × 365 / annual runoff |
| = 3.375 ac-ft × 365 / 10.917 ac-ft/yr | |
| = 112.8 days (program 112.8). |
Removal. The wet detention equations of AH Vol I Appendix O at 112.8 days, with a littoral zone, give TN 42.12 % and TP 75.00 %. The worksheet’s Equations page shows each equation with these numbers; the Wet Detention Methodology explains them.
Load out.
| TN out | = load in × (1 − removal) |
| = 23.825 × (1 − 42.12 / 100) | |
| = 13.791 kg/yr (program 13.791) |
| TP out | = 4.402 × (1 − 75.00 / 100) |
| = 1.100 kg/yr (program 1.100). |
5Files
- sizing-wet-detention.bmpt: the project, saved by BMPFast. Save it (your browser puts it in Downloads). In BMPFast press Open Project, then Open Project again in the Open BMPFast Project dialog (below its Recent Projects list), and choose the file.
- Summary Report (as BMPFast shows it)
- BMP report (worksheet) (as BMPFast shows it)
6Help and methodology
Calculated with BMPFast 1.1.9 (build 6.0.0, 2026-10-16). Older versions may not have the Equations button or may give slightly different results; download the latest at bmpfast.com. Screen captures are for demonstration only.