SoftwarePlus.ai

All programs › BMPFast › Sample problems

Exfiltration trench under a parking lot

A 36-inch pipe in a 300 ft trench; All sites non-exempted, Zone 3.

1The problem

A 2-acre commercial parking lot drains to a 300 ft exfiltration trench with a 36-inch perforated pipe.

InputValueSource
Project (General Site Information)
Meteorological zoneFlorida Zone 3Zone map (help page 815)
Mean annual rainfall54 inMean annual rainfall map (help page 815)
Performance standard (analysis type)All sites non-exemptedSite (illustrative)
Catchment 1: Commercial site (Watershed Characteristics)
Land use, pre / postUndeveloped - Mesic Flatwoods / High-Intensity CommercialSite (illustrative)
Area, pre / post2 / 2 acSite (illustrative)
Non-DCIA curve number, pre / post70 / 80Site (illustrative)
DCIA, pre / post0 / 70 %Site (illustrative)
EMC TN, pre / post1.087 / 2.400 mg/LBMPFast land use table (AH Vol I Table 9.2)
EMC TP, pre / post0.043 / 0.345 mg/LBMPFast land use table (AH Vol I Table 9.2)
Exfiltration Systems (worksheet)
Pipe Span36 inDesign (illustrative)
Pipe Rise36 inDesign (illustrative)
Pipe Length300 ftDesign (illustrative)
Trench/Vault Width6 ftDesign (illustrative)
Trench/Vault Depth5 ftDesign (illustrative)
Trench/Vault Length300 ftDesign (illustrative)
Void space fraction not in pipe0.4Design (illustrative)
Time to recover design volume72 hrDesign (illustrative)

Find: the TN and TP removal of the BMP, the loads leaving the site, and whether the performance standard is met.

2Steps in BMPFast

  1. Press New Project. On General Site Information (the main window; its title bar reads General Site Information and your license key) type the project name Exfiltration trench: commercial site, choose Florida Zone 3, enter 54 in of mean annual rainfall and choose the performance standard All sites non-exempted.

    General Site Information (the main window).
    General Site Information (the main window).
  2. Press 1. Enter Catchment. For Catchment 1 type the name Commercial site, choose the land uses Undeveloped - Mesic Flatwoods (pre) and High-Intensity Commercial (post), enter the areas 2 and 2 ac, the non-DCIA curve numbers 70 and 80 and the DCIA 0 and 70 %, then press Calculate. BMPFast shows the annual runoff coefficient, the runoff and the TN and TP loads. Press Back.

    Watershed Characteristics Worksheet (1. Enter Catchment).
    Watershed Characteristics Worksheet (1. Enter Catchment).
  3. Press 2. Enter Treatment and then Exfiltration Trench/Vault. On the Exfiltration Systems worksheet: Pipe Span 36 in; Pipe Rise 36 in; Pipe Length 300 ft; Trench/Vault Width 6 ft; Trench/Vault Depth 5 ft; Trench/Vault Length 300 ft; Void space fraction not in pipe 0.4; Time to recover design volume 72 hr. Press Calculate. The report on the worksheet shows the inputs and the results.

    The BMP worksheet after Calculate: the report on the left.
    The BMP worksheet after Calculate: the report on the left.
  4. Press the same button again, now labelled Equations: the worksheet shows each equation with this problem’s values. Press Back to return to the treatment options.

    The same worksheet showing Equations: each equation with this problem’s values.
    The same worksheet showing Equations: each equation with this problem’s values.
  5. On the main window press 3. Configure Catchments and double-click Catchment 1. Choose Exfiltration as the BMP used in routing and the Outlet as where it goes. Press Back twice. (A catchment’s BMP is only used once it is chosen here.)

    Routing for Catchment 1 (3. Configure Catchments): the BMP used and where the catchment goes.
    Routing for Catchment 1 (3. Configure Catchments): the BMP used and where the catchment goes.
  6. Press 4. Summary Report. The Report Viewer shows the loads, the removal and whether the performance standard is met. Press Save Project to keep your copy; compare it with the .bmpt under Files.

    The Summary Report (4. Summary Report) in the Report Viewer.
    The Summary Report (4. Summary Report) in the Report Viewer.

3Results

ResultValue
Catchment 1: computed by BMPFast
Annual runoff coefficient (ROC), pre / post0.078 / 0.596
Runoff, pre / post0.702 / 5.364 ac-ft/yr
TN load, pre / post0.941 / 15.873 kg/yr
TP load, pre / post0.037 / 2.282 kg/yr
Exfiltration: computed by BMPFast
Treatment depth0.671 in
Hydraulic capture efficiency59.61 %
Provided TN / TP removal59.61 % / 59.61 %
TN load in → out15.873 → 6.411 kg/yr
TP load in → out2.282 → 0.922 kg/yr
Site (all catchments, at the outlet)
TN load: catchments → outlet15.873 → 6.411 kg/yr
TP load: catchments → outlet2.282 → 0.922 kg/yr
Provided removal TN / TP59.6 % / 59.6 %
Required removal TN / TP (Maximum % Removal)94.1 % (not met) / 98.4 % (not met)

The BMP report

Open this report on its own page.

The Summary Report

Open this report on its own page.

4Check

Runoff and loads (Equations 9-1 and 9-2 of AH Vol I).

1.233 kg is 1 mg/L in 1 ac-ft.

Storage.

Treatment depth.

Capture. The retention efficiency tables for Florida Zone 3 at a treatment depth of 0.671 in, non-DCIA CN 80.00 and DCIA 70.0 % give a hydraulic capture of 59.61 % (AH Vol I Appendix O; read the same tables with Tools › Retention Efficiency Lookup Tables, help page 4325). An exfiltration system is a retention BMP: the removal equals the capture.

Load out.

The standard is not met, and that is expected. “All sites non-exempted” requires the greater of 55 % TN and 80 % TP, or the removal that keeps the post-development load at the pre-development load (Equation 9-3) (AH Vol I 8.3.2). The post = pre removal (Equation 9-3, (post load − pre load) / post load) is TN 94.1 % and TP 98.4 %. BMPFast takes the larger of the standard’s percentage and the post = pre removal as the Maximum % Removal, shown on every worksheet’s status bar and in the Summary Report: here TN 94.1 % and TP 98.4 %. This problem shows what this design removes (59.6 % / 59.6 %), which is less. To meet it, add BMPs in series or downstream catchments (see BMPs in Series and Routing), or size the BMP (see Sizing).

The program’s Equations page

Open this report on its own page.

5Files

6Help and methodology

Calculated with BMPFast 1.1.9 (build 6.0.0, 2026-10-16). Older versions may not have the Equations button or may give slightly different results; download the latest at bmpfast.com. Screen captures are for demonstration only.