Cost analysis: stormwater harvesting with a water credit

Example Problem 4: pump station, force main and pond, with the resale credit.

1The problem

The BMPFast sample project Example Problem 4: the stormwater harvesting system (pond, intermittent pump station, force main), mowing four times a year, 6,000 kWh a year of pumping, and a credit for the water sold (Stormwater Resale). Discount rate 3.3 %, 30 years, inflation 2.5 %.

InputValueSource
Project (General Site Information)
Meteorological zoneFlorida Zone 5Zone map (help page 815)
Mean annual rainfall61 inMean annual rainfall map (help page 815)
Performance standard (analysis type)Net ImprovementBMPFast sample project
Cost analysis
Discount rate3.3 %Cost analysis parameters
Duration30 yearsCost analysis parameters
BMP inflation rate2.5 %Cost analysis parameters

Find: the present worth, the annual cost and the cost per pound of TN and TP removed.

2Steps in BMPFast

  1. Press 6. Cost Analysis. The hub lists every catchment’s BMP; set the discount rate and duration in A.

    The Cost Analysis hub (6. Cost Analysis).
    The Cost Analysis hub (6. Cost Analysis).
  2. Double-click the Stormwater Harvesting row. In B enter the components (construction low and high, life, O&M %), in C the routine costs, in D the energy; press Calculate.

    Cost analysis of one BMP: A parameters and B components.
    Cost analysis of one BMP: A parameters and B components.
  3. Collapse B and open C: the routine maintenance costs, here with the Stormwater Resale credit where there is one (a negative cost). Open E for the summary: present worth, annual cost and cost per pound (the results below).

    The same window with C open: the routine maintenance costs.
    The same window with C open: the routine maintenance costs.
  4. Back on the hub, Unit Cost Summary Report shows the costs of every BMP. Press Save Project to keep your copy; compare it with the .bmpt under Files.

    The Unit Cost Summary Report.
    The Unit Cost Summary Report.

3Results

Result (low – high)Value
Construction$175,000 – $265,000
Present value of replacements$34,240 – $51,360
Present value of O&M$99,420 – $143,632
Present worth$308,660 – $459,992
Annualized cost$16,364 – $24,388
Cost per lb TN removed$318.39 – $474.50
Cost per lb TP removed$2,300.52 – $3,428.44
TN / TP removed32.31 / 4.47 lb/yr

The component cost report

Open this report on its own page.

Unit Cost Summary Report

Open this report on its own page.

4Check

Annualized cost.